| Amending Rule | Title | Proponent(s) | Determination Date | Commencement | Version | Year |
|---|---|---|---|---|---|---|
| Obligations of Network Service Providers - Connection Applications | Energy Solutions Australia | 26-Apr-2007 | ||||
| Origin Energy Participant Derogation (Technical Requirements for Mount Stuart Power Station) | Origin Energy | 11-Jan-2007 | 4 | |||
| 2011 No. 2 | Network Support and Control Ancillary Services | AEMO | 7-Apr-2011 | 5-Apr-2012 | 42 | 2012 |
| Assumed utilisation of imputation credits | SP Ausnet and Electranet | 20-Sep-2012 | 4 | |||
| Changes to Cost Allocation Method | Trans Tasman Energy Group | 8-Aug-2013 | 4 | |||
| 2009 No. 11 | Demand Management | TEC | 23-Apr-2009 | 1-Jul-2009 | 30 | 2009 |
| Causer Pays for Ancillary Services to Control the Tasmanian frequency | Hydro Tasmania | 15-Oct-2009 | 4 | |||
| 2013 No. 5 | Network Service Provider Expenditure Objectives | SCER | 19-Sep-2013 | 26-Sep-2013 | 58 | 2013 |
| 2008 No. 3 | Economic Regulation of Transmission Services Undertaken by Distributors | EnergyAustralia | 26-Jun-2008 | 1-Jul-2008 | 21 | 2008 |
| 2010 No. 14 | Release of Generator information by AEMO | Senergy Econnect Australia Pty Ltd | 23-Dec-2010 | 20-Jan-2011 | 41 | 2011 |
| 2006 No. 6 | System restart ancillary service arrangements and pricing under market suspension | NEMMCO | 20-Apr-2006 | 20-Apr-2006 | 4 | 2006 |
| 2009 No. 1 | Ramp Rates, Market Ancillary Service Offers, and Dispatch Inflexibility | AER | 16-Jan-2009 | 31-Mar-2009 | 27 | 2009 |
| 2013 No. 8 | Negative offers from scheduled network service providers | IPRA and LYMMCo | 19-Dec-2013 | 1-Jan-2014 | 60 | 2014 |
| 2010 No. 2 | Timing for intervention compensation determinations | AEMO | 25-Mar-2010 | 25-Mar-2010 | 35 | 2010 |
| 2006 No. 18 | Economic Regulation of Transmission Services | AEMC | 16-Nov-2006 | 16-Nov-2006 | 10 | 2006 |
| 2010 No. 12 | Provision of Metering Data Services and Clarification of Existing Metrology Requirements | AEMO | 25-Nov-2010 | 16-Dec-2010, 20/01/2011 [Schedule 4] | 40 | 2010 |
| 2010 No. 5 | Cost Recovery for Other Services Directions | AEMO | 13-May-2010 | 1-Jul-2011 | 54 | 2011 |
| 2013 No. 4 | Reliability Panel Public Meetings | Reliability Panel | 15-Aug-2013 | 15-Aug-2013 | 57 | 2013 |
| 2006 No. 1 | Revision to dispatch pricing due to manifestly incorrect inputs | NEMMCO | 17-Nov-2005 | 1-Jun-2006 | 6 | 2006 |
| Futures Offset Arrangements | Australian Power & Gas Infratil Energy Australia Momentum Energy | 16-Apr-2009 | 4 | |||
| 2008 No. 9 | Regulatory Test Thresholds and Information Disclosure on Network Replacements | ETNOF | 23-Oct-2008 | 23-Oct-2008 | 22 | 2008 |
| 2010 No. 3 | SA Jurisdictional Derogation (Connections Charging) | South Australian Minister for Energy | 6-May-2010 | 1-Jul-2010 | 38 | 2010 |
| 2008 No. 11 | Easement Land Tax Pass Through | SP Ausnet | 27-Nov-2008 | 1-Jan-2009 | 24 | 2009 |
| 2006 No. 10 | Reform of dispute resolution process for the Regulatory Test | MCE | 29-Jun-2006 | 1-Jul-2006 | 7 | 2006 |
| 2009 No. 9 | National Transmission Statement | MCE | 2-Apr-2009 | 16-Apr-2009 | 28 | 2009 |
| 2006 No. 12 | Extension of Inter-regional Settlements Agreement | Department of Infrastructure (Victoria) | 13-Jul-2006 | 13-Jul-2006 | 8 | 2006 |
| 2012 No. 4 | Cost pass through arrangements for network service providers | Grid Australia | 2-Aug-2012 | 2-Aug-2012 | 4 | 2012 |
| 2012 No. 5 | Distribution Network Planning and Expansion Framework | MCE | 11-Oct-2012 | 1-Jan-2013, 01-Jan-2014 [Schedule 5] | 54 | 2013 |
| 2009 No. 10 | Negative Settlements Residue Recovery, Extension of Sunset | NEMMCO | 16-Apr-2009 | 16-Apr-2009 | 28 | 2009 |
| 2007 No. 4 | NEMMCO Participant Derogation (Deferral of Settlement Payments due to APEC) | NEMMCO | 16-Aug-2007 | 16-Aug-2007 | 15 | 2007 |
| 2007 No. 6 | Efficient Dispatch of Regulation Services | Hydro Tasmania | 23-Aug-2007 | 1-Jan-2009 | 24 | 2009 |
| 2009 No. 15 | Regulatory Investment Test for Transmission | MCE | 25-Jun-2009 | 1-Jul-2009 | 30 | 2009 |
| 2009 No. 16 | Arrangements for Managing Risks Associated with Transmission Network Congestion - Rule 16 | MCE | 13-Aug-2009 | 1-Sep-2009 | 31 | 2009 |
| 2008 No. 4 | WACC - Alignment of Reviews | AER | 26-Jun-2008 | 1-Jul-2008 | 21 | 2008 |
| 2013 No. 2 | Changes to normal voltage | GDF Suez Australian Energy | 28-Feb-2013 | 7-Mar-2013 | 55 | 2013 |
| 2006 No. 11 | Inspection and Testing of Metering Installations | EnergyAustralia | 29-Jun-2006 | 1-Jul-2006 | 7 | 2006 |
| 2008 No. 14 | Preservation of Prudential Margin Through Call Notices | NEMMCO | 27-Nov-2008 | 1-Jan-2009 | 4 | 2009 |
| 2009 No. 19 | Improved RERT Flexibility and Short-notice Reserve Contracts | Reliability Panel | 15-Oct-2009 | 15-Oct-2009 | 32 | 2009 |
| 2013 No. 1 | Inter-regional Transmission Charging | MCE | 28-Feb-2013 | 1-Jul-2014, 01-July-2015 [Schedules 1 & 2] | 63 | 2014 |
| 2007 No. 11 | Process for Region Change (formerly called Region Boundaries) | MCE | 20-Dec-2007 | 1-Jul-2008 | 21 | 2008 |
| 2011 No. 4 | Minor Changes 2011 - Electricity | AEMC | 16-Jun-2011 | 1-Jul-2011 | 44 | 2011 |
| 2007 No. 2 | Technical Standards for Wind Generation and Other Generator Connections | NEMMCO | 8-Mar-2007 | 15-Mar-2007 | 13 | 2007 |
| 2013 No. 6 | Access to NMI standing data | EnergyAustralia | 31-Oct-2013 | 31-Oct-2013 | 59 | 2013 |
| 2007 No. 1 | Reallocations | NEMMCO | 15-Feb-2007 | 31-May-2007 | 14 | 2007 |
| 2006 No. 20 | NEMMCO Participant Derogation (Extension of Cost Recovery of Regulation Services in Tasmania) | NEMMCO | 7-Dec-2006 | 7-Dec-2006 | 12 | 2006 |
| 2008 No. 1 | Integration of NEM Metrology Requirements | NEMMCO | 6-Mar-2008 | 6-Mar-2008 | 19 | 2008 |
| 2014 No. 1 | Publication of zone substation data | NGF | 13-Mar-2014 | 13-Mar-2014 | 60 | 2014 |
| 2011 No. 6 | Application of Dual Marginal Loss Factors | AEMO | 29-Jun-2011 | 30-Jun-2011 | 44 | 2011 |
| 2006 No. 22 | Pricing of Prescribed Transmission Services | AEMC | 21-Dec-2006 | 28-Dec-2006 | 12 | 2006 |
| 2008 No. 16 | Queensland Generator Technical Performance Standards Derogations | Queensland Government | 11-Dec-2008 | 1-Jan-2009 | 24 | 2009 |
| Alternative Snowy Region Boundary (Discontinued) | Macquarie Generation | 22-Mar-2007 | ||||
| 2010 No. 11 | Aggregation of Ancillary Services Loads | AEMO | 9-Sep-2010 | 16-Sep-2010 | 39 | 2010 |
| 2009 No.8 | Transmission Network Prices Publication Date | EnergyAustralia | 26-Mar-2009 | 31-Mar-2009 | 27 | 2009 |
| Transmission Last Resort Planning Guidelines | AEMC | 10-Jul-2007 | ||||
| 2011 No. 5 | Reliability Settings from 1 July 2012 | Reliability Panel | 16-Jun-2011 | 1-Jul-2011 | 44 | 2011 |
| 2009 No. 21 | Bid and Offer Validation Data | AEMO | 3-Dec-2009 | 16-Dec-2010 | 40 | 2010 |
| Management of negative settlement residues by re-orientation | Snowy Hydro Limited | 9-Nov-2006 | ||||
| Parameter Values, Equity Beta and Gamma | EUAA | 13-Nov-2008 | ||||
| 2006 No. 9 | Participation in SRA - EnergyAustralia Participant Derogation | NEMMCO | 16-Jun-2006 | 22-Jun-2006 | 7 | 2006 |
| 2008 No. 12 | Setting VoLL Following the Shedding of Interruptible Load | AER | 20-Nov-2008 | 20-Nov-2008 | 23 | 2008 |
| 2012 No. 8 | Small Generation Aggregator Framework | AEMO | 29-Nov-2012 | 1-Jan-2013 | 54 | 2013 |
| 2007 No. 5 | Cost Recovery of Localised Regulation Services | NGF | 23-Aug-2007 | 1-Jan-2009 | 24 | 2009 |
| Split Snowy Region | Macquarie Generation | 8-Nov-2007 | ||||
| 2009 No. 13 | NEM Reliability Settings: VoLL, CPT and Future Reliability Review | Reliability Panel | 18-Dec-2008 | 28-May-2009 | 29 | 2009 |
| 2006 No. 8 | Advocacy Panel | MCE | 15-Jun-2006 | 1-Jul-2006 | 7 | 2006 |
| 2011 No. 8 | Tasmania Tranche 5a Procedure Changes | Tasmanian Government | 14-Jul-2011 | 14-Jul-2011 | 45 | 2011 |
| 2012 No. 2 | Negative intra-regional settlements residue | AEMO | 22-Mar-2012 | 5-Apr-2012 | 49 | 2012 |
| 2009 No. 7 | Minor Changes 2009 | AEMC | 26-Mar-2009 | 31-Mar-2009 | 27 | 2009 |
| Recovery of Network Support Payments | SP Ausnet | 31-Oct-2013 | ||||
| Contingency Administered Price Cap Following a Physical Trigger Event | NGF | 4-Jun-2009 | ||||
| 2010 No. 6 | Minor Changes 2010 | AEMC | 3-Jun-2010 | 10-Jun-2010, 16/12/2010 | 40 | 2010 |
| 2009 No. 3 | Cost Allocation Arrangements for Transmission Services | NGF | 29-Jan-2009 | 13-Feb-2009 | 25 | 2009 |
| Total Factor Productivity for Distribution Network Regulation | Minister for Energy and Resources (Victoria) | 22-Dec-2011 | ||||
| 2011 No. 10 | Efficiency Benefit Sharing Scheme and Demand Management Expenditure by Transmission Businesses | MCE | 22-Dec-2011 | 22-Dec-2011 | 47 | 2011 |
| 2009 No. 6 | WACC Reviews - Extension of Time | AER | 26-Mar-2009 | 31-Mar-2009 | 27 | 2009 |
| 2008 No. 7 | Minor Change to Technical Requirement for Generators | NEMMCO | 7-Aug-2008 | 23-Oct-2008 | 22 | 2008 |
| Optimisation of Regulatory Asset Base and Use of Fully Depreciated Assets | Major Energy Users Inc. | 13-Sep-2012 | ||||
| 2007 No.9 | Timing of System Restart Ancillary Services Testing | NEMMCO | 25-Oct-2007 | 25-Oct-2007 | 17 | 2007 |
| 2012 No. 7 | Distribution Losses in Expenditure Forecasts | The Copper Development Centre | 18-Oct-2012 | 1-Jan-2013 | 54 | 2013 |
| 2008 No. 15 | Registration changes for Traders, Reallocators, and Transfer of Registration | NEMMCO | 4-Dec-2008 | 1-Jan-2009 | 24 | 2009 |
| 2006 No. 21 | Resolution of existing generator performance standards | NGF | 7-Dec-2006 | 7-Dec-2006 | 12 | 2006 |
| 2007 No. 7 | Abolition of Snowy Region | Snowy Hydro Limited | 30-Aug-2007 | 30-Aug-2007 | 16 | 2007 |
| 2006 No. 7 | Reliability Safety Net Extension | Reliability Panel | 11-May-2006 | 18-May-2006 | 5 | 2006 |
| 2010 No. 8 | Publication of a Carbon Dioxide Equivalent Intensity Index for the National Electricity Market | AEMO | 22-Jul-2010 | 22-Jul-2010 | 38 | 2010 |
| 2014 No. 4 | AER Authorisation of Software Changes by AEMO | AER | 17-Apr-2014 | 17-Apr-2014 | 62 | 2014 |
| 2006 No. 3 | Review of operating incidents | NEMMCO | 2-Feb-2006 | 2-Feb-2006 | 3 | 2006 |
| 2008 No. 17 | Compensation Arrangements Under Administered Pricing | EnergyAustralia | 18-Dec-2008 | 1-Jan-2009 | 24 | 2009 |
| Transmission network replacement and reconfiguration | Stanwell Corporation Limited | 1-Mar-2007 | ||||
| 2008 No. 5 | WACC Parameters – Technical Drafting Issues | AER | 26-Jun-2008 | 1-Jul-2008 | 21 | 2008 |
| 2008 No. 6 | NEM Reliability Settings: Information, Safety Net and Directions | Reliability Panel | 26-Jun-2008 | 1-Jul-2008 | 21 | 2008 |
| 2007 No. 8 | Minor Changes 2007 | AEMC | 11-Oct-2007 | 25-Oct-2007 | 17 | 2007 |
| 2007 No. 10 | Registration of Foreign Based Persons and Corporations as Trader Class Participants | BP Energy Asia | 20-Dec-2007 | 1-Jan-2008 | 18 | 2008 |
| Potential Generator Market Power in the NEM | Major Energy Users Inc. | 26-Apr-2013 | ||||
| 2011 No. 11 | Inclusion of Embedded Generation Research into Demand Management Incentive Scheme | MCE | 22-Dec-2011 | 22-Dec-2011 | 47 | 2011 |
| 2010 No.9 | Timing for spot price reporting | AER | 22-Jul-2010 | 22-Jul-2010 | 38 | 2010 |
| 2006 No. 5 | Statement of Opportunities Update | NEMMCO | 13-Apr-2006 | 20-Apr-2006 | 4 | 2006 |
| 2008 No. 13 | Clarification of Market Information Requirements for Market Ancillary Services | NEMMCO | 27-Nov-2008 | 1-Jan-2009 | 24 | 2009 |
| 2006 No. 14 | Management of negative settlement residues in the Snowy Region | NEMMCO International Power Southern Hydro NRG Flinders Hydro Tasmania LYMMCO | 14-Sep-2006 | 1-Nov-2006 | 10 | 2006 |
| 9 | Calculation of Return on Debt for Electricity Network Businesses | Energy Users Rule Change Committee | 29-Nov-2012 | 29-Nov-2012 | 53 | 2012 |
| Congestion Pricing and Negative Residue Management Arrangements for the Snowy Region | International Power TRUenergy NRG Flinders Hydro Tasmania LYMMCO | 8-Nov-2007 | ||||
| 2012 No. 1 | Expiry of the Reliability and Emergency Reserve Trader | Reliability Panel | 15-Mar-2012 | 15-Mar-2012, 1-Jul-16 | 48 | 2012 |
| 2009 No. 12 | AETV Participant Derogation to Allow Commissioning of a New Power Station | Aurora Energy (Tamar Valley) Pty Ltd | 28-May-2009 | 28-May-2009 | 29 | 2009 |
| 2008 No. 2 | Central Dispatch and Integration of Wind and Other Intermittent Generation | NEMMCO | 1-May-2008 | 1-May-2008, 31-Mar-2009 [Schedule 2] | 20 | 2008 |
| 2010 No. 7 | Payments under Feed-in Schemes and Climate Change Funds | ETSA Utilities | 1-Jul-2010 | 1-Jul-2010 | 38 | 2010 |
| 2006 No. 2 | Publication of Information for Non-scheduled Generation | NEMMCO | 15-Dec-2005 | 12-Jan-2006, 01 Jul 06 | 7 | 2006 |
| 2012 No. 3 | Minor Changes 2012 | AEMC | 14-Jun-2012 | 26-Jul-2012, 01/07/2016 [Schedule 2] | 51 | 2012 |
| 2011 No. 9 | Application and operation of Administered Price Periods | AEMO | 10-Nov-2011 | 10-Nov-2011, 2-July-2012 [Schedule 2] | 46 | 2011 |
| 2010 No. 1 | Early Implementation of Market Impact Parameters | Grid Australia | 11-Mar-2010 | 12-Mar-2010 | 34 | 2010 |
| 2009 No. 4 | Confidentiality Arrangements in Respect of Information Required for Power System Studies | NGF | 19-Feb-2009 | 27-Feb-2009 | 26 | 2009 |
| Dispatch of Scheduled Network Services | Hydro Tasmania | 16-Aug-2007 | ||||
| 2011 No. 1 | DNSP recovery of transmission-related charges | United Energy Distribution | 24-Mar-2011 | 24-Mar-2011 | 42 | 2011 |
| 2006 No. 15, 16 | Studland Bay Wind Farm Participant Derogations | Woolnorth Studland Bay Pty Ltd | 19-Oct-2006 | 1-Nov-2006 | 10 | 2006 |
| 2009 No. 2 | Victorian Jurisdictional Derogation (Advanced Metering Infrastructure Roll Out) | Minister for Energy and Resources (Victoria) | 29-Jan-2009 | 1-Jul-2009 | 30 | 2009 |
| 2008 No. 8 | Reclassification of Contingency Events | AER | 2-Oct-2008 | 23-Oct-2008 | 22 | 2008 |
| 2006 No. 19 | Reform of the Regulatory Test Principles | MCE | 30-Nov-2006 | 30-Nov-2006 | 11 | 2006 |
| 2006 No.13 | TransGrid Participant Derogation (Treatment of Contingent Projects (Interim Arrangements) | TransGrid | 27-Jul-2006 | 27-Jul-2006 | 9 | 2006 |
| 2012 No. 6 | New Prudential Standard and Framework in the NEM | AEMO | 18-Oct-2012 | 1-Nov-2012 | 52 | 2012 |
| 2011 No. 3 | Business day definition | AEMO | 21-Apr-2011 | 21-Apr-2011 | 43 | 2011 |
| 2013 No. 7 | Victorian jurisdictional derogation, advanced metering infrastructure | Minister for Energy and Resources (Victoria) | 28-Nov-2013 | 1-Jan-2014 | 60 | 2014 |
| 2009 No. 20 | Confidentiality Provisions for Network Connections | Grid Australia | 12-Nov-2009 | 12-Nov-2009 | 33 | 2009 |
| Definition of Temporary Over-Voltage Limits | Hydro Tasmania | 19-Jan-2012 | ||||
| 2010 No.4 | Transparency of Operating Data | AEMO | 11-May-2010 | 13-May-2010 | 35 | 2010 |
| Governance of retail market procedures | AEMO | 31-Jul-2014 | 24-Oct-2014 | 2014 | ||
| 2008 No. 10 | Performance Standard Compliance of Generators | NGF | 23-Oct-2008 | 23-Oct-2008 | 22 | 2008 |
| 2010 No. 13 | Amendments to PASA-related Rules | AEMO | 2-Dec-2010 | 16-Dec-2010 | 40 | 2010 |
| 2007 No.3 | Transmission Last Resort Planning | MCE | 8-Mar-2007 | 15-Mar-2007 | 13 | 2007 |
| 2013 No. 3 | Minor Rule Change 2013 | AEMC | 30-May-2013 | 4-Jul-2013 | 56 | 2013 |
| 2010 No.10 | Victoria Generator Technical Performance Standards Derogations | Minister for Energy and Resources (Victoria) | 9-Sep-2010 | 16-Sep-2010 | 39 | 2010 |
| 2011 No. 12 | Network Support Payments and Avoided TUoS for Embedded Generators | MCE | 22-Dec-2011 | 22-Dec-2011 | 47 | 2011 |
| 2009 No. 14 | EnergyAustralia Participant Derogation Extension (Settlement Residue Auctions) | EnergyAustralia | 11-Jun-2009 | 1-Jul-2009 | 30 | 2009 |
| 2006 No. 17 | Metrology | NEMMCO | 9-Nov-2006 | 9-Nov-2006 | 10 | 2006 |
| 2011 No. 7 | Scale Efficient Network Extensions | MCE | 30-Jun-2011 | 1-Jul-2011 | 44 | 2011 |
| 2006 No. 4 | Recovery of negative inter-regional settlements residue | NEMMCO | 30-Mar-2006 | 1-Jul-2006 | 7 | 2006 |
| 2009 No. 5 | Removal of Performance Standard for Identifying Manifestly Incorrect Inputs | NEMMCO | 26-Feb-2009 | 27-Feb-2009 | 26 | 2009 |
| Annual Network Pricing Arrangements | Other | 27-Nov-2014 | ||||
| 2014 No. 9 | Distribution Network Pricing Arrangements | SCER IPART | 27-Nov-2014 | 1-Dec-2014, 01-Jan-2017 [Schedule 2] | 66 | 2014 |
| 2014 No. 3 | Connecting embedded generators | ClimateWorks, Seed, Property Council | 17-Apr-2014 | 1-Oct-2014 | 2014 | |
| 2012 No. 9 | Economic Regulation of Network Service Providers | AER and EURCC | 29-Nov-2012 | 29-Nov-2012, 1-Jan-2013 [Schedule 4] | 4 | 2012 |
| 2015 No. 2 | Generator ramp rates and dispatch inflexibility in bidding | AER | 19-Mar-2015 | 1-Jul-2016 | 2016 | |
| 2014 No. 2 | Victorian jurisdictional derogation (smelter agreements) | Minister for Energy and Resources (Victoria) | 10-Apr-2014 | 1-Aug-2014 | 64 | 2014 |
| 2015, No 5 | System Restart Ancillary Services | AEMO GDF Suez Australian Energy Origin Energy NGF AGL Energy Limited Alinta Energy Energy Brix Intergen | 2-Apr-2015 | 1-Jul-2015 | 72 | 2015 |
| 2014 No. 5 | Minor Changes 2014 | AEMC | 22-May-2014 | 1-Jul-2014, 01/10/2014 [Schedule 2] | 63 | 2014 |
| 2015 No. 13 | Bidding in Good Faith | Minister for Mineral Resources and Energy (South Australia) | 10-Dec-2015 | 1-Jul-2016 | 2016 | |
| 2015 No. 12 | Expanding competition in metering and related services | COAG Energy Council | 26-Nov-2015 | 26-Nov-2015, 01/12/2017 | 76 | 2015 |
| 2014 No. 6 | Extension of Call Notice Timing | AEMO | 12-Jun-2014 | 1-Jul-2014 | 63 | 2014 |
| NER 2014 No. 7; NERR 2014 No.2 | Customer access to information about their energy consumption | COAG Energy Council | 6-Nov-2014 | 1-Dec-2014, 1-Sep-2015 [Schedules 2 & 3 NERR], and 1-Mar-2016 [Schedule 1 NERR] | 66 | 2014 |
| 2014 No. 8 | Connecting embedded generators under Chapter 5A | Clean Energy Council | 13-Nov-2014 | 1-Mar-2015 | 67 | 2015 |
| 2015 No. 1 | Early application of STPIS components to transmission businesses | ElectraNet | 19-Feb-2015 | 19-Feb-2015 | 68 | 2015 |
| 2015 No. 3 | Governance Arrangements and Implementation of the Reliability Standard and Settings | COAG Energy Council | 17-Mar-2015 | 26-Mar-2015 | 70 | 2015 |
| 2015 No. 4 | Improving demand side participation information provided to AEMO by registered participants | COAG Energy Council | 26-Mar-2015 | 26-Mar-2015 | 70 | 2015 |
| 2015 No. 8 | Demand Management Incentive Scheme | TEC COAG Energy Council | 20-Aug-2015 | 20-Aug-2015, 01-Dec-2016 [Schedules 1, 2 & 3] | 73 | 2015 |
| 8 | Demand Management and Embedded Generation Connection | TEC COAG Energy Council | 20-Aug-2015 | 20-Aug-2015, 1 December 2016 | 73 | 2015 |
| 2016 No. 1 | Compensation arrangements following application of an administered price cap and administered floor | COAG Energy Council | 4-Feb-2016 | 4-Feb-2016, 29-Sep-2016 [Schedule 2] | 78 | 2016 |
| NER and NGR Final Rules | Retailer insolvency costs - pass through provisions | COAG Energy Council | 2-Feb-2017 | 9-Feb-2017 | 2017 | |
| 2015 No. 15 | Embedded Networks | AEMO | 17-Dec-2015 | 17-Dec-2015, 01-Dec-2016 [Schedule 1]; 01-Dec-2017 [Schedules 2, 4 & 5] | 76 | 2015 |
| 2015 No. 6 | Aligning TasNetworks’ regulatory control periods | TasNetworks | 9-Apr-2015 | 9-Apr-2015 | 71 | 2015 |
| Rule not made | Multiple Trading Relationships | AEMO | 25-Feb-2016 | |||
| NER and NGR Final Rules | Retailer-Distributor Credit Support Requirements | AGL Energy Limited | 2-Feb-2017 | 9-Feb-2017 | 2017 | |
| 2016 No. 2 | Meter Replacement Processes | ERM Power | 10-Mar-2016 | 10-Mar-2016, 01-Dec-2017 [Schedule 1] | 78 | 2016 |
| 2015 No. 9 | AEMO access to demand forecasting information | COAG Energy Council | 22-Oct-2015 | 22-Oct-2015 | 74 | 2015 |
| Aligning network and retail tariff structures for small customers | COAG Energy Council | 17-Sep-2015 | ||||
| 2016 No.10 | Demand Response Mechanism and Ancillary Services Unbundling | COAG Energy Council | 24-Nov-2016 | 1-Jul-2017 | 2017 | |
| 2015 No. 7 | Minor Changes 2015 | AEMC | 4-Jun-2015 | 1-Jul-2015 | 72 | 2015 |
| Compliance with dispatch instructions | Snowy Hydro Limited | 5-May-2016 | ||||
| 2016 No.8 | Application of offsets in the prudential margin calculation | AEMO | 22-Sep-2016 | 29-Sep-2016 | 2016 | |
| Demand side obligations to bid into central dispatch | Snowy Hydro Limited | 12-Sep-2017 | ||||
| 2015 No. 10 | Common definitions of distribution reliability measures | COAG Energy Council | 29-Oct-2015 | 5-Nov-2015, 30-June-2017 [Schedule 2] | 75 | 2015 |
| 2016 No. 12 | Local Generation Network Credits | City of Sydney Total Environment Centre Property Council of Australia | 8-Dec-2016 | 15-Dec-2016, 01-07-17 | 87 | 2016 |
| 4 | Transmission Connection and Planning Arrangements | COAG Energy Council | 23-May-2017 | 30-May-2017, 01/07/2018 | 92 | 2017 |
| 2015 No. 11 | Second Minor Changes 2015 | AEMC | 5-Nov-2015 | 5-Nov-2015 | 75 | 2015 |
| 2015 No. 14 | Review frequency for the Template for Generator Compliance Programs | Reliability Panel | 3-Dec-2015 | 17-Dec-2015 | 2015 | |
| Improving the accuracy of customer transfers | COAG Energy Council | 2-Feb-2017 | ||||
| Rule not made | Using estimated reads for customer transfers | COAG Energy Council | 2-Feb-2017 | |||
| 2016 No. 3 | Energy Adequacy Assessment Projection timeframes | AEMO | 19-May-2016 | 26-May-2016, 1-Nov-2016 [Schedule 2] | 80 | 2016 |
| 2016 No.6 | Updating the electricity B2B framework | COAG Energy Council Red Energy Lumo Energy | 30-Jun-2016 | 30-Jun-2016, (Schedules 1 and 5 of Amending Rule); 01-12-17 (Schedules 2, 3 and 4 of Amending Rule) | 82 | 2016 |
| 2017 No. 15 | Five Minute Settlement | Sun Metals Corporation Pty Ltd | 28-Nov-2017 | 1-Jul-2021 | 104 | 2021 |
| 2016 No. 5 | Extension of the Reliability and Emergency Reserve Trader | COAG Energy Council | 23-Jun-2016 | 23-Jun-2016, 01-Nov-2017 [Schedule 2] | 81 | 2016 |
| 2016 No. 11 | Market participant suspension framework | COAG Energy Council | 1-Dec-2016 | 1-Jan-2017 | 88 | 2017 |
| Non-scheduled generation and load in central dispatch | Snowy Hydro Limited ENGIE | 12-Sep-2017 | ||||
| 2016 No. 4 | Registration of proponents of new types of generation | AEMO | 26-May-2016 | 26-May-2016 | 80 | 2016 |
| 2016 No.7 | Register of Large Generator connections | COAG Energy Council | 1-Sep-2016 | 1-Jul-2017 | 2017 | |
| 2016 No. 9 | Rate of Return Guidelines review | AER | 13-Oct-2016 | 20-Oct-2016 | 84 | 2016 |
| NER 5 | Replacement expenditure planning arrangements | AER | 18-Jul-2017 | 18-Jul-2017, 18-09-17 | 94 | 2017 |
| Inertia Ancillary Service Market | AGL Energy Limited | 6-Feb-2018 | ||||
| 2017 No. 6 | Participant derogation - NSW DNSPs Revenue Smoothing | Ausgrid Endeavour Energy Essential Energy | 1-Aug-2017 | 15-Aug-2017 | 2017 | |
| Managing the rate of change of power system frequency | South Australian Minister for Mineral Resources and Energy | 19-Sep-2017 | 1-Jul-2018 | 2018 | ||
| 2017 No.2 | Emergency overfrequency control schemes | South Australian Minister for Mineral Resources and Energy | 30-Mar-2017 | 6-Apr-2017 | 89 | 2017 |
| 2017 No.2 | Emergency frequency control schemes | South Australian Minister for Mineral Resources and Energy | 30-Mar-2017 | 6-Apr-2017 | 89 | 2017 |
| Managing power system fault levels | South Australian Minister for Mineral Resources and Energy | 19-Sep-2017 | 17-Nov-2017, 01/07/2018 | 2017 | ||
| No. 16 | Contestability of energy services | COAG Energy Council | 12-Dec-2017 | 19-Dec-2017 | 104 | 2017 |
| Alternatives to grid-supplied network services | Western Power | 19-Dec-2017 | ||||
| 2017 No. 7 | Participant derogation - ACT DNSP Revenue Smoothing | ActewAGL | 1-Aug-2017 | 15-Aug-2017 | 2017 | |
| Contestability of energy services - demand response and network support | Australian Energy Council | 12-Dec-2017 | ||||
| 11 | Generating system model guidelines | AEMO | 19-Sep-2017 | 19-Sep-2017, 2018-07-01 | 97 | 2017 |
| 13 | Secondary trading of settlement residue distribution units | Westpac Banking Corporation | 10-Oct-2017 | 20-Oct-2017 | 100 | 2017 |
| 2017 No. 3 | Minor Changes 2017 | AEMC | 19-Apr-2017 | 2-May-2017 | 91 | 2017 |
| 8 | Classification of loads as ancillary service loads | AEMO | 8-Aug-2017 | 29-Aug-2017 | 96 | 2017 |
| 12 | Application of rate of return guidelines to TasNetworks | TasNetworks | 26-Sep-2017 | 3-Oct-2017 | 99 | 2017 |
| 14 | Pricing during market suspension | AEMO | 10-Oct-2017 | 1-Dec-2017 | 101 | 2017 |
| Rule made no.13, Rules version 115 | Participant compensation following market suspension | AEMO | 15-Nov-2018 | 22-Nov-2018, 20/12/18 and 1/07/21 | 2018 | |
| 17 | Declaration of lack of reserve conditions | AEMO | 19-Dec-2017 | 19-Dec-2017, 2018-01-16 | 104 | 2017 |
| Generator technical performance standards | AEMO | 27-Sep-2018 | 5-Oct-2018 | 2018 | ||
| 2018 No. 9 | Register of distributed energy resources | COAG Energy Council | 13-Sep-2018 | |||
| 1 | System restart plan release provisions | AEMO | 20-Feb-2018 | 27-Feb-2018 | 2018 | |
| 2 | Testing of system restart ancillary services capability | AEMO | 20-Mar-2018 | 10-Apr-2018 | 2018 | |
| 3 | Implementation of demand management incentive scheme | AER | 3-Apr-2018 | 10-Apr-2018 | 2018 | |
| Rule 2018 No.8 | Establishing values of customer reliability | COAG Energy Council | 5-Jul-2018 | 10-May-2018 | 2018 | |
| Reporting of aggregate generation capacity for MT PASA | AEMO | 24-May-2018 | 31-May-2018 | 2018 | ||
| 6, Rules version 110 | Reliability Panel governance arrangements | Reliability Panel | 7-Jun-2018 | 1-Jul-2018 | 2018 | |
| 2018 No. 4 | Minor changes 2018 | AEMC | 3-Apr-2018 | 10-Apr-2018, Schedule 2: 01-Jul-2018 | 107 | 2018 |
| 3 | Enhancement to the Reliability and Emergency Reserve Trader | AEMO | 2-May-2019 | 31-Oct-2019, 26-Mar-2020 | 2019 | |
| 15 (NEL) and 7 (NERL) | Metering installation timeframes | The Honourable Josh Frydenberg MP, on behalf of the Australian Government | 6-Dec-2018 | 16 | ||
| 7 | Reinstatement of the long notice Reliability and Emergency Reserve Trader | AEMO | 21-Jun-2018 | 21-Jun-2018, 13/07/2018 | 2018 | |
| Generator three year notice of closure | Dr Kerry Schott AO | 8-Nov-2018 | ||||
| Global settlement and market reconciliation | AEMO | 6-Dec-2018 | ||||
| Estimated meter reads | The Honourable Josh Frydenberg MP, on behalf of the Australian Government Dr Daryl Dodt Kirsty Johnson (Private individual) | 25-Oct-2018 | 1-Feb-2019 | 2019 | ||
| 2018 No. 4 | Estimated meter reads – self reads (retail) | The Honourable Josh Frydenberg MP, on behalf of the Australian Government | 25-Oct-2018 | |||
| 2018 No. 4 | Estimated meter reads – solar systems | Dr Daryl Dodt | 25-Oct-2018 | |||
| Meter installation – planned interruptions | Australian Energy Council | 6-Dec-2018 | ||||
| Meter installation – advanced meter communications | Australian Energy Council | 21-Mar-2019 | ||||
| 9 | Wholesale demand response mechanism | Public Interest Advocacy Centre Total Environment Centre The Australia Institute | 11-Jun-2020 | 31-Mar-2021, 24 October 2021 | 142 | 2021 |
| 2020 No. 9 | Wholesale demand response mechanism (retail) | Public Interest Advocacy Centre Total Environment Centre The Australia Institute | 11-Jun-2020 | |||
| 2018 No. 11 | Minor changes 2 | AEMC | 8-Nov-2018 | 9-Nov-2018 | 2018 | |
| 2020 No. 9 | Wholesale demand response register mechanism | Australian Energy Council | 11-Jun-2020 | 31-Mar-2021, 24 October 2021 | 142 | 2021 |
| 2020 No. 9 | Wholesale demand response register mechanism (retail) | Australian Energy Council | 11-Jun-2020 | |||
| Market making arrangements in the NEM | ENGIE | 19-Sep-2019 | ||||
| 2020 No. 9 | Mechanisms for wholesale demand response | South Australian Minister for Energy | 11-Jun-2020 | 31-Mar-2021, 2021-10-24 | 142 | 2021 |
| 2020 No. 9 | Mechanisms for wholesale demand response (retail) | South Australian Minister for Energy | 11-Jun-2020 | |||
| 2 | Transmission loss factors | Adani Renewables | 27-Feb-2020 | 5-Mar-2020, Schedule 1 and 3 commence 5 March 2020, Schedule 2 commences 1 July 2021 | 133 | 2020 |
| 11 | Application of the Regional Reference Node Test to the Reliability and Emergency Reserve Trader | AEMO | 19-Dec-2019 | 20-Dec-2019, 01-Jul-2021 | 2019 | |
| Alignment of intervention compensation and settlement timetables | AEMO | 30-May-2019 | 30-May-2019, 2019-07-01 | 2019 | ||
| 5, Rule version 121 | Intervention compensation and settlement processes | AEMO | 30-May-2019 | 30-May-2019, 01/07/2021 | 2019 | |
| No.12 | Generator registrations and connections | Australian Energy Council Mr Damien Vermeer | 21-Oct-2021 | 24-Oct-2021, Schedule 1 of the Rule commences on 21 April 2022 | 2021 | |
| 8 | Transparency of new projects | Australian Energy Council | 24-Oct-2019 | 7-Nov-2019, 01/12/2019, 19/12/2019 | 2019 | |
| 12 | Threshold for participant compensation following market intervention | AEMO | 19-Dec-2019 | 20-Dec-2019 | 2019 | |
| Short term forward market | AEMO | 5-Mar-2020 | ||||
| Early implementation of ISP priority projects | Dr Kerry Schott AO | 4-Apr-2019 | 11-Apr-2019 | 2019 | ||
| NEM information for project developers | AEMO | 24-Oct-2019 | ||||
| Loss factor frameworks | Adani Renewables | 27-Feb-2020 | ||||
| ISP priority projects – SA Energy Transformation | Dr Kerry Schott AO | 11-Apr-2019 | ||||
| AER reporting on FCAS market outcomes | AER | 25-Jul-2019 | ||||
| Application period for contingent project revenue | Dr Kerry Schott AO | 26-Apr-2019 | 2-May-2019 | 2019 | ||
| 11 | Demand management incentive scheme and innovation allowance for TNSPs | Energy Networks Australia | 5-Dec-2019 | 31-Mar-2021 | 128 | 2021 |
| Version 124 | Five minute settlement and global settlement implementation amendments | AEMO | 8-Aug-2019 | |||
| TNSP exemptions from confidentiality requirements | Energy Networks Australia | 24-Oct-2019 | ||||
| Improving transparency and extending duration of MT PASA | ERM Power | 20-Feb-2020 | 133 | |||
| Extension of MT PASA duration | ERM Power | 20-Feb-2020 | ||||
| 1 | Efficient reactive current access standards for inverter-based resources | Renewable Energy Revolution Pty Ltd | 27-Apr-2023 | 2023 | ||
| No.6 | Monitoring and reporting on frequency control framework | AEMO | 25-Jul-2019 | 1-Jan-2020 | 2020 | |
| 2020 No. 7 | Introduction of metering coordinator planned interruptions | Chair of the Competition Metering Industry Group (CMIG), a sub-branch of Master Electricians Australia | 21-May-2020 | 28-May-2020, Schedule 1 (NER, NERR) commences on 21 July 2020, Schedule 2 (NERR) commences on 21 August 2020, Schedule 2 (NER) commences on 1 July 2021 | 139 | 2020 |
| 2019 No. 14 | Reducing customers’ switching times | AEMO | 19-Dec-2019 | |||
| Rule 2020 No. 5. | Primary frequency response requirement | Dr Peter Sokolowski | 26-Mar-2020 | 4-Jun-2020 | 2020 | |
| No.8 | Primary frequency response incentive arrangements | AEMO | 8-Sep-2022 | 8-Sep-2022, Sunday 8 June 2025 | 187 | 2022 |
| 6 | System restart services, standards and testing | AEMO | 2-Apr-2020 | 2-Apr-2020, Schedule 1 of this Rule commences on 2 November 2020 | 2020 | |
| National Electricity Amendment (Transparency of unserved energy calculation) Rule 2020 No. 16 | Transparency of unserved energy calculation | AEMC Reliability Panel | 19-Nov-2020 | 17-Dec-2020, Schedule 2 on 19 November 2020 | NER v154 and NT NER v62 | 2020 |
| Mandatory primary frequency response | AEMO | 26-Mar-2020 | 4-Jun-2020, 4/06/23, 26/03/20 | 5 | 2020 | |
| Integrating energy storage systems into the NEM | AEMO | 2-Dec-2021 | 9-Dec-2021, Schedules 1 to 6 of the Rule commence on 3 June 2024 | 2021 | ||
| System restart services procedures | AER | 2-Apr-2020 | ||||
| 13 | Application of compensation in relation to AEMO interventions | AEMO | 19-Dec-2019 | 20-Dec-2019, 01-Jul-2021 | 129 | 2019 |
| 2019 No. 9 | Minor changes 2019 | AEMC | 21-Nov-2019 | 21-Nov-2019 | 127 | 2019 |
| 2020 No. 4 | Victorian jurisdictional derogation – RERT contracting | The Honourable Lily D'Ambrosio MP, Minister for Energy, Environment and Climate Change, Minister for Solar Homes | 12-Mar-2020 | 16-Apr-2020 | 134 | 2020 |
| 14 | Compensation for market participants affected by intervention events | AEMO | 2-Dec-2021 | 9-Dec-2021 | 175 | 2021 |
| 14 | Affected participant compensation for FCAS losses | AEMO | 2-Dec-2021 | 9-Dec-2021, 1 August 2022 | 175 | 2021 |
| Recovering affected participant compensation for RERT activation | AEMO | 10-Sep-2020 | ||||
| Rule 2020, No. 18 | Compensation following directions for services other than energy and market ancillary services | AEMO | 17-Dec-2020 | 21-Mar-2021, 17 December 2020 | 2021 | |
| 13 | Changes to intervention mechanisms | AEMO | 10-Sep-2020 | 17-Sep-2020 | 150 | 2020 |
| 9 | Improving security frameworks for the energy transition | Hydro Tasmania and Delta Electricity | 28-Mar-2024 | |||
| 14 | Removal of intervention hierarchy | AEMO | 10-Sep-2020 | 22-Oct-2020, Schedules 1, 2 and 3 of this Rule commence operation on 22 October 2020. Schedule 4 of this Rule commences operation on 24 October 2021, immediately after the commencement of Schedules 1, 3, 4 and 5 of the National Electricity Amendment (Wholesale demand | 149 | 2020 |
| Removal of obligation to counteract during intervention | AEMO | 10-Sep-2020 | ||||
| Connection to dedicated connection assets | AEMO | 8-Jul-2021 | 8-Jul-2021, Schedules 1 to 4 of the rule commence operation on 22 July 2021 | 2021 | ||
| 2020 No. 3 | Minor changes 2020 | AEMC | 12-Mar-2020 | 19-Mar-2020, Schedule 2 of National Electricity Amendment: 6 February 2022 | 135 | 2020 |
| 6 | Enhancing reserve information (formerly Operating reserves) | Iberdrola Australia Limited and Delta Electricity | 21-Mar-2024 | 6 | ||
| Fast frequency response market ancillary service | Infigen Energy Limited | 15-Jul-2021 | 22-Jul-2021, Schedule 1 commences operation on 9 October 2023 and Schedule 2 commences operation on 22 July 2021 | 2021 | ||
| 10 | Delayed implementation of five minute and global settlement | AEMO | 9-Jul-2020 | 9-Jul-2020 | 2020 | |
| 2020 No. 8 | Minor changes 2 2020 | AEMC | 28-May-2020 | 4-Jun-2020 | 141 | 2020 |
| 11 | Efficient management of system strength on the power system | TransGrid | 21-Oct-2021 | 1-Dec-2022, NER version 174 and NT NER version 79 for schedule 10 commences 24/10/2021 | NER version 174 | 2022 |
| 1 | Technical standards for distributed energy resources | AEMO | 25-Feb-2021 | 18-Dec-2021, 4 March 2021 | 158 | 2021 |
| 2020 no.11 | Deferral of network charges | AER | 6-Aug-2020 | 6-Aug-2020 | 146 | 2020 |
| 5 | Implementing a general power system risk review | COAG Energy Council | 3-Jun-2021 | 10-Jan-2022, Schedule 2 commences 3 June 2021 | 164 | 2022 |
| 1 | Enhancing operational resilience in relation to indistinct events | COAG Energy Council | 3-Mar-2022 | 10-Mar-2022, Schedule 1 of the Rule commences on 9 March 2023 and Schedule 2 of the Rule commences on 3 June 2024 | 179 | 2022 |
| Prioritising arrangements for system security during market suspension | COAG Energy Council | 17-Jun-2021 | ||||
| Capacity commitment mechanism for system security and reliability services | Delta Electricity | 28-Mar-2024 | ||||
| Introduction of ramping services | Delta Electricity | 21-Mar-2024 | ||||
| Network planning and access for distributed energy resources | Total Environment Centre and Australian Council of Social Service | 12-Aug-2021 | ||||
| Allowing DNSPs to charge for exports to the network | St Vincent de Paul Society Victoria | 12-Aug-2021 | ||||
| 9 | Access, pricing and incentive arrangements for distributed energy resources | SA Power Networks | 12-Aug-2021 | 19-Aug-2021, Schedule 2 of this Rule commences on 1 July 2022 | 170 | 2021 |
| 2020 No. 12 | Minor changes 3 2020 | AEMC | 20-Aug-2020 | 27-Aug-2020 | 149 | 2020 |
| 17 | Simplification of NER definitions | AEMO Dr Kerry Schott AO | 26-Nov-2020 | 22-Feb-2021 | 157 | 2021 |
| Amendments to NER definitions to align with the NEL | Dr Kerry Schott AO | 26-Nov-2020 | ||||
| 15 | Reallocation of national transmission planner costs | AEMO | 29-Oct-2020 | 29-Oct-2020 | NER 152 | 2020 |
| 19 | Prudent discounts in an adoptive jurisdiction | The Honourable Lily D'Ambrosio MP, Minister for Energy, Environment and Climate Change, Minister for Solar Homes | 17-Dec-2020 | 17-Dec-2020 | 2020 | |
| No.12 | Improving connection process for embedded generators | Mr Damien Vermeer | 21-Oct-2021 | |||
| Governance of distributed energy resources technical standards | Dr Kerry Schott AO | 17-Mar-2022 | ||||
| 2 | Semi-scheduled generator dispatch obligations | AER | 11-Mar-2021 | 11-Mar-2021, Schedule 1 - 12 April 2021; Schedule 2 - 1 October 2021; Schedule 3 - 24 October 2021; Schedule 4 11 March 2021 | 157 | 2021 |
| Participant derogation – financeability of ISP projects (TransGrid) | TransGrid | 8-Apr-2021 | ||||
| Participant derogation – financeability of ISP Projects (ElectraNet) | ElectraNet | 8-Apr-2021 | ||||
| 2020 No. 20 | Minor changes 4 2020 | AEMC | 17-Dec-2020 | 17-Dec-2020 | 156 | 2020 |
| Rule 2022 No. 6 | Improving consultation procedures in the rules | AEMO | 4-Aug-2022 | 11-Aug-2022 | NER 185, NT NER 90 | 2022 |
| 3.15 | NEM settlement under low, zero and negative demand conditions | AEMO | 17-Jun-2021 | 1-Sep-2021, Schedule 1 – 1 September 2021 and Schedule 2 – 1 October 2021 | No.6 of 2021 | 2021 |
| 10 | Material change in network infrastructure project costs | ERM Power Energy Users Association of Australia (EUAA) Major Energy Users Inc. AGL Energy Limited Delta Electricity | 27-Oct-2022 | 27-Oct-2022, Monday, 9 October 2023 | NER v189 and NT NER v94 (for transitionals) | 2022 |
| 10 | Settlement under low operational demand | Infigen Energy Limited | 7-Oct-2021 | 10-Oct-2022 | 173 | 2022 |
| 2021 No. 3 | Minor changes 1 2021 | AEMC | 22-Apr-2021 | 22-Apr-2021 | 163 | 2021 |
| Performance standards for reactive current response to disturbance | GE International Inc Goldwind Australia Pty Ltd Siemens Gamesa Renewable Energy Pty Ltd Vestas Australia Wind Technology Pty Ltd | 20-Apr-2023 | ||||
| 2021 No. 4 | Minor changes 2 2021 | AEMC | 27-May-2021 | 27-May-2021 | 165 | 2021 |
| 2022 No. 4 | Updating Short Term PASA | AEMO | 5-May-2022 | 19-May-2022, - Schedule 3 commences; and 03-Jun-2024 Schedule 2 commences | 2022 | |
| Contingency arrangements for five minute settlement implementation | AEMO | 9-Sep-2021 | 1-Oct-2021 | 2021 | ||
| 16 | Removal of unaccounted for energy from liable load in the Retailer Reliability Obligation | AEMO | 23-Dec-2021 | 1-May-2022 | 2022 | |
| Recovering the cost of AEMO’s participant fees | Energy Networks Australia | 20-Oct-2022 | 27-Oct-2022 | 2022 | ||
| No.2 | Extension of time and reduction in scope of the 2022 reliability standard and settings review | Dr Kerry Schott AO | 3-Mar-2022 | 10-Mar-2022 | 178 | 2022 |
| 15 | Minor changes 3 2021 | AEMC | 16-Dec-2021 | 10-Jan-2022 | 177 | 2022 |
| 7 | Enhancing information on generator availability in MT PASA | AEMO | 18-Aug-2022 | 18-Aug-2022, Schedule 1: 9 October 2023, Schedule 2: 3 June 2024, Schedule 3: 31 July 2025, Schedule 4: 18 August 2022 | NER v186, NT NER v91 | 2022 |
| Efficient provision of inertia | Australian Energy Council | 9-Oct-2025 | ||||
| AER reporting on market outcomes | AER | 19-May-2022 | 19-May-2022 | 2022 | ||
| 2022 No. 3 | Minor changes 1 2022 | AEMC | 21-Apr-2022 | 21-Apr-2022 | 180 | 2022 |
| 12 | Establishing revenue determinations for Intending TNSPs | Marinus Link Pty Ltd | 22-Dec-2022 | 23-Jan-2023 | 2023 | |
| 15, 4 | Unlocking CER benefits through flexible trading | AEMO | 15-Aug-2024 | 31-May-2025, - Schedule 2, 1-Nov-2026 - Schedules 3, 4 and 5; 29-Aug-2024 - Schedule 1 and 6 | NER 215, NERR 42 | 2025 |
| 2022 No. 11 | Amending the administered price cap | Alinta Energy | 17-Nov-2022 | 1-Dec-2022 | 191 | 2022 |
| Minor changes 1 2023 | AEMC | 201 | ||||
| 24 | Integrating price-responsive resources into the NEM | AEMO | 19-Dec-2024 | 27-May-2027, Schedule 1 ; 31-March-2026, Schedule 2 ; 1-Jan-2026, Schedule 3 ; 23-May-2027, Schedule 4 ; 19-Dec-2024, Schedule 5 | 222 | 2027 |
| Implementing integrated energy storage systems | AEMO | 4-May-2023 | 11-May-2024 | 2024 | ||
| 6 | Amendment of the Market Price Cap, Cumulative Price Threshold and Administered Price Cap | Reliability Panel | 7-Dec-2023 | 1-Jul-2025, 01-July-2026; 01-July-2027 | 2025 | |
| 1 | Calculating the cumulative price | Delta Electricity | 23-Apr-2026 | 1-Nov-2028 | 244 | 2028 |
| 8 | Accommodating financeability in the regulatory framework | The Honourable Chris Bowen, Minister for Climate Change and Energy and Energy Networks Australia | 21-Mar-2024 | 29-Mar-2024 | 208 | 2024 |
| 7 | Sharing concessional finance benefits with consumers | The Honourable Chris Bowen, Minister for Climate Change and Energy | 21-Mar-2024 | 29-Mar-2024 | 208 | 2024 |
| 5 | Enhancing community engagement in transmission building | The Honourable Chris Bowen, Minister for Climate Change and Energy | 9-Nov-2023 | 5-Dec-2023 | 204 | 2023 |
| 3 | Clarifying mandatory primary frequency response obligations for bidirectional plant | AEMO | 7-Mar-2024 | 3-Jun-2024, Sunday, 8 June 2025 | 2024 | |
| 13 | Enhancing investment certainty in the R1 process | Clean Energy Council | 27-Jun-2024 | 11-Jul-2024 | 214 | 2024 |
| 2023 No.4 | Extension of the application of the IRM to the RRO | AEMO | 21-Sep-2023 | 21-Sep-2023 | 202 | 2023 |
| 1 | Harmonising the national energy rules with the updated national energy objectives (electricity) | Energy Senior Officials on behalf of the Ministerial Council on Energy | 1-Feb-2024 | 1-Feb-2024 | 205 | 2024 |
| 4 | Improving the workability of the feedback loop | The Honourable Chris Bowen, Minister for Climate Change and Energy | 7-Mar-2024 | 14-Mar-2024 | 207 | 2024 |
| Integrating price-responsive resources into the NEM (retail) | AEMO | |||||
| CPT calculation during administered scheduled pricing | Snowy Hydro Limited | 23-Apr-2026 | ||||
| Rule 2 of 2024 | Calculation of system strength quantity | AEMO | 29-Feb-2024 | 206 | ||
| 20 | Accelerating smart meter deployment | Intellihub, SA Power Networks and Alinta Energy | 28-Nov-2024 | 217 | ||
| 17 | Bringing early works forward to improve transmission planning | The Honourable Chris Bowen, Minister for Climate Change and Energy | 5-Sep-2024 | 5-Sep-2024 | 216 | 2024 |
| 18 | Providing flexibility in the allocation of interconnector costs | The Honourable Chris Bowen MP; The Honourable Lily D’Ambrosio MP; The Honourable Nick Duigan MLC | 3-Oct-2024 | |||
| Rule 2024 No.14 | Managing ISP project uncertainty through targeted ex post reviews | The Honourable Chris Bowen, Minister for Climate Change and Energy | 1-Aug-2024 | |||
| 22 | Shortening the settlement cycle | Globird Energy Pty. Ltd. | 12-Dec-2024 | 19-Dec-2024, Schedule 2 ; 09-Aug-2026, Schedule 1 | 222 | 2024 |
| Rule 5 of 2024 | Resetting Powerlink’s system strength unit prices | Powerlink Queensland | 14-Mar-2024 | 14-Mar-2024 | 207 | 2024 |
| Expanding the transmission ring-fencing framework | AER | |||||
| 9 | Inter-regional settlements residue arrangements for transmission loops | AEMO | 25-Sep-2025 | 2-Oct-2025 | 2025 | 2025 |
| 23 | Cyber security roles and responsibilities | The Honourable Chris Bowen, Minister for Climate Change and Energy | 12-Dec-2024 | 12-Dec-2024 | 221 | 2024 |
| 19 | Retailer reliability obligation exemption for scheduled bi-directional units | Tesla, Neoen and Iberdrola | 14-Nov-2024 | 3-Dec-2024, 1-Nov-2026 | 217 | 2024 |
| Minor changes 1 2024 | AEMC | 30-May-2024 | 3-Jun-2024 | 211 | 2024 | |
| 6 | Improving the NEM access standards – Package 1 | AEMO | 22-May-2025 | 21-Aug-2025 | 2025 | |
| 2 | Improving the cost recovery arrangements for Transmission non-network options | TransGrid | 13-Mar-2025 | 13-Mar-2025 | 225 | 2025 |
| No 25 and No. 7 of 2024 | Better integration of gas and community sentiment into the ISP | The Honourable Chris Bowen, Minister for Climate Change and Energy | NER version 222 and NGR version 83 | |||
| No. 26 and of 2024 | Improving consideration of demand-side factors in the ISP | The Honourable Chris Bowen, Minister for Climate Change and Energy | 19-Dec-2024 | NER version 222 | ||
| Better integration of gas and community sentiment into the ISP | The Honourable Chris Bowen, Minister for Climate Change and Energy | 19-Dec-2024 | ||||
| Minor changes 2 2024 | AEMC | 29-Aug-2024 | 29-Aug-2024 | 215 | 2024 | |
| 12 | Real-time data for consumers | Energy Consumers Australia | 18-Dec-2025 | 240 | ||
| 5 | Including distribution network resilience in the National Electricity Rules | The Honourable Lily D’Ambrosio MP, Victorian Minister for Energy and Resources | 8-May-2025 | 228 | ||
| Rule 2024 No. 21 | Rescheduling the generator compliance programs review | Reliability Panel | 28-Nov-2024 | 5-Dec-2024 | 2024 | |
| 11 | Clarifying registration for non-generating units providing system security services | CS Energy | 4-Dec-2025 | 4-Dec-2025 | 236 | 2025 |
| 2025 No. 8 | Allowing AEMO to accept cash as credit support | Delta Electricity | 26-Jun-2025 | 1-Nov-2026, 3-Jul-2025 | 2026 | |
| 4 | Removing the requirement to publish transmission information guidelines | AER | 27-Mar-2025 | 27-Mar-2025 | 227 | 2025 |
| 2025 No. 3 | Amendment to frequency performance payment cost recovery | AEMO | 13-Mar-2025 | 8-Jun-2025, Schedule two (transitionals): Thursday, 20 March 2025 | 226 | 2025 |
| 1 | South Australian jurisdictional derogation – Interim reliability reserve eligibility | Hon Tom Koutsantonis MP, Minister for Energy and Mining in South Australia | 23-Jan-2025 | 23-Jan-2025 | 224 | 2025 |
| 6 | Real-time data for consumers (Retail) | Energy Consumers Australia | 30-Nov-2028 | 2028 | ||
| Consultation requirements for the Metrology Procedures | AEMO | 23-Apr-2026 | ||||
| 2 | Improving metering and metrology arrangements | AEMO | 23-Apr-2026 | 30-Apr-2026 | 245 | 2026 |
| Refining the eligibility requirements for Secondary Settlement Points | AEMO | 23-Apr-2026 | ||||
| Minor changes 1 2025 | AEMC | 29-May-2025 | 29-May-2025 | 2025 | ||
| 3 | Enhancing access for registered participant representatives (Electricity) | AEMO | 30-Apr-2026 | 7-May-2026, Schedule 2; and 1-Mar-2027, Schedule 1 | 244 | 2026 |
| Enhancing access for registered participant representatives (Gas) | AEMO | 30-Apr-2026 | ||||
| 4 | Early application of a revised transmission Service Target Performance Incentive Scheme | AER | 2026 | |||
| Minor changes 2 2025 | AEMC | 27-Nov-2025 | 27-Nov-2025 | 2025 | ||
| 5 | Small changes to Integrating Price-Responsive Resources rule | AEMO | 14-May-2026 | 21-May-2026, Schedule 1; and 23-May-2027, Schedule 2 | 246 | 2026 |
Media Centre Contact
For all media enquiries please email the AEMC Media Manager.
Subscribe
Register to receive AEMC news updates and announcements by email.
Follow Us
Follow the AEMC on LinkedIn for the latest news, events and publications.
Calendar